Diggin’ in Deep

Can you dig it? When it comes to construction, yes, you often do. One dig isn’t necessarily the same as another. No two worksites are the same.

A 4d worksite detail or logistics vignette focuses audience attention to the dig and its main features, such as haul ramps, access roads, pits, dewatering, and underpinning.

Vinci’s worksite sections are highly effective at explaining underpinning and bank retention.

Some of Vinci LLC’s visuals have helped teams validate their approach—before work even begins!

Nothing beats Vinci SubVision™ when you need to explain subsurface conditions that constrain or facilitate your dig.

Why yammer about it during your interview? Show it to ’em and talk to your main selling points. Let Vinci LLC’s visuals explain the cut.

So when you need to dig and explain yourself, consider Vinci LLC’s convincing construction visualization.

 

Excavation Examples

Here are one dozen six examples of excavation-related visualization. Click on an image below to visit an Example Page. Check out the blue links for further examples or information!

>
Underpinning Karst Bedrock Excavation Pit Access Ramp Underground Existing Improvements

Vinci LLC’s worksite sections are ideal for highlighting underpinning and karst stone caissons

Vinci LLC’s convincing rendition of bank retention, haul ramps, and the client’s innovative pit access solution brought home an Ivy job

Vinci LLC’s SubVision™ technology can help highlight existing underground obstacles in your excavation presentation

Bank Retention Validation Excavation Pit Access Ramp Underground Utility Excavation

Bank retention validation, using civil survey and excavator shop drawings, helped guarantee temporary site access

Excavation transitioning into concrete foundation work

Deep long utility realignment digs are easily explained using Vinci LLC’s 4d worksite details

Utility Trench Excavation Schedule Soil Remediation Excavation Excavation Cuts and Fills

Vinci LLC’s vignettes present your utility trench construction strategy clearly to user groups and the community

Vinci LLC can demonstrate soil remediation topics in your next excavation presentation

Vinci LLC specializes in overlaying your analytics on the Digital Worksite™ model!

4d Excavation Detail Infill Worksite 4d Excavation Section at Right-of-Way Excavation Bank Retention

Demolition is a popular topic. Next comes the excavation and even some under an active hospital, in the mousehole at upper right

A 4d worksite section can help explain digs to your audience. It might even help you win the project

Convincing rendition of bank retention, haul ramps, deep stone pits, and crane travel roads helped clinch this Ivy job

Underground Utility Tunnel and Dock Access Ramp Alternate Ramp Excavation Frost Wall Deep Excavation Study

Vinci LLC’s vignettes present your utility trench construction strategy clearly to user groups and the community

Vinci LLC can demonstrate soil remediation topics in your next excavation presentation

A vignette studying the implications of shallow vs deep layback excavations

Underground Garage Haul Ramp Deep Excavation Bedrock Section Temporary Ramp Pit Entrance

Ramps and hoisting equipment help your team make a case for room to move on the worksite

Worksite sections can tell the story of temporary retaining walls and bedrock cuts so your team can focus on the pitch

Simple ideas are even more simply presented with 4d worksite sections and convincing rendering

Frost Wall Deep Excavation Study Excavation Implications Tight Site Excavation

A vignette studying the implications of shallow vs deep layback excavations. Here’s another study

Some urban excavations engage context above and underground

Example of a tight site excavation

This page last modified Monday 11 January 2016.