Around and Over What’s Already There!

Vinci LLC’s client commissioned a brief set of sequences illustrating the construction of a cancer center addition atop a loading dock drive and electrical ductbank and around a medicine facility. The jobsite is cramped, and the foundation contorted. The illustrations help clarify sequence and illustrate points of concern (crane picks over the roadway, locations of the hoist and staging area, etc.) The actual imagery set is simple but the project is a bit tricky. Click the images on the following menu to view the examples:

a8987-00 a8987-10 a8987-20

GCS™ | 4d General Worksite Overview

A view of all major activities on a tight site from a single vantage point.

DCS™ | 4d Worksite Detail
Wrapping around Existing Facility


Slipping in around an existing medicine facility.

DCS™ | SubVision Solid™
Site Utilities vs. Foundation


Slipping over and atop a live electrical ductbank.

a8987-30 a8987-90 a8987-91

DWS™ | Construction Vignette
Field Office & Staging Area


A tight mobilization for a tight worksite.

SubVision Solid™
Vinci · Behind the Scenes
Site Utility Constraints


See production shots that deal with existing electrical ductbanks that must be left in place under the foundation during and after construction.

SubVision Solid™
Vinci · Behind the Scenes
Site Utility Foundation Sequence


A production sequence illustrating what is conveyed by the design development documents for the benefit of Vinci LLC’s builder-client.