Vinci A9285 Example Navigator

Welcome to the example navigator! This menu accesses one dozen eleven examples deriving from Vinci Project Number A9285. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example.
a9285-00 a9285-06 a9285-10 a9285-12

GCS SVS _UU
General 4d Construction Worksite Overview | Interval
All major worksite activity throughout the construction schedule.

GCS SVS _UU
General 4d Construction Worksite Overview | Continuous
All major worksite activity throughout the construction schedule.

DCS _EN _UU
4d Worksite Detail
Trench East | Overview

Overview of the first phase of ductbank installation until street crossover.

DCS _EN _LL
4d Worksite Detail
Trench East | Staging Yard

Branded contractor staging yard.

a9285-14 a9285-16 a9285-18 a9285-20

DCS _EN _UU
4d Worksite Detail
Trench East
Parking Lot Entry Crossings

Utility trench cuts across parking lot entry drives but does not shut them down.

DCS _EN _UU
4d Worksite Detail
Trench East
Garage Access and Lawn

Underground utility trench installation proceeds in front of a major parking structure.

DCS _EN _UU
4d Worksite Detail
Trench East | Street Crossing

Closeup of a phased underground utility street crossing

DCS _EN _UU
4d Worksite Detail
Trench West | Overview

Overview of the second phase of ductbank installation, within the street right-of-way.

a9285-22 a9285-24 a9285-26 a9285-27

DCS _EN _UU
4d Worksite Detail
Trench West at Ingress

Utility trenching crosses a parking entrance but does not shut it down

DCS _EN _UU
4d Worksite Detail
Trench West | Academic Drive Lane

Utility trench cuts across an academic drive lane

DCS _EN _UU
4d Worksite Detail
Trench West | Sidewalk Bend

A bend around existing underground utilities takes the trench into the sidewalk

DCS _EN _UU
Logistics Vignette
Trench West | Delivery Manhole

Termination of open trench, begin utility boring

a9285-28 a9285-29 a9285-30 a9285-34

DCS _EN _UU
4d Worksite Detail
Trench West | Terminal Strip

Termination of open trench, begin utility boring

CSV _LL _UU
Logistics Vignette
Terminal Bore Site

Street-based location for final bore across thoroughfare

CSV _TC _LL
Logistics Vignette
Trench West
Curb Cut Traffic Channelization

One of several closeups of curb cut trenching

CSV _LL _TC
Logistics Vignette
Trench East
Parking Lot Entry Crossing

One of many closeups of drive crossings that do not cshut down traffic

a9285-38 a9285-40 a9285-50 a9285-53

CSV _LL _TC
Logistics Vignette
Trench West | Roadway Manhole at Academic Drive

Detail of roadway manhole installation at curb cut

SVS _EN _UU
Vinci SubVision Solid™
Underground Intersection Crossing

Final bore under thoroughfare

CSV _EN _LL
Logistics Vignette
Rooftop and Areaway Hoisting

A view showing crane location for rooftop mechanical placement

CSV _EN _LL
Logistics Vignette
Rooftop and Areaway Hoisting

A view showing crane location for rooftop mechanical placement

a9285-56 a9285-59 a9285-90  

CSV _TC _LL
Logistics Vignette
Rooftop and Areaway Hoisting
Schedule

Accommodating just-in-time delivery of mechanical components

CSV _TC _LL
Logistics Vignette
Rooftop and Areaway Hoisting
Detail

Closeup of crane location

VVV _SG _TC
Vinci | Behind the Scenes
Signage & Traffic Channelization

Custom and common traffic channelization and site safety signs

 
This page last modified Wednesday 30 July 2014.