Welcome to the example navigator! This menu accesses one dozen eleven examples deriving from Vinci Project Number A9285. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example.
|
|
|
|
GCS SVS _UU
General 4d Construction Worksite Overview | Interval
All major worksite activity throughout the construction schedule. |
GCS SVS _UU
General 4d Construction Worksite Overview | Continuous
All major worksite activity throughout the construction schedule. |
DCS _EN _UU
4d Worksite Detail Trench East | Overview
Overview of the first phase of ductbank installation until street crossover. |
DCS _EN _LL
4d Worksite Detail Trench East | Staging Yard
Branded contractor staging yard. |
|
|
|
|
DCS _EN _UU
4d Worksite Detail Trench East Parking Lot Entry Crossings
Utility trench cuts across parking lot entry drives but does not shut them down. |
DCS _EN _UU
4d Worksite Detail Trench East Garage Access and Lawn
Underground utility trench installation proceeds in front of a major parking structure. |
DCS _EN _UU
4d Worksite Detail Trench East | Street Crossing
Closeup of a phased underground utility street crossing |
DCS _EN _UU
4d Worksite Detail Trench West | Overview
Overview of the second phase of ductbank installation, within the street right-of-way. |
|
|
|
|
DCS _EN _UU
4d Worksite Detail Trench West at Ingress
Utility trenching crosses a parking entrance but does not shut it down |
DCS _EN _UU
4d Worksite Detail Trench West | Academic Drive Lane
Utility trench cuts across an academic drive lane |
DCS _EN _UU
4d Worksite Detail Trench West | Sidewalk Bend
A bend around existing underground utilities takes the trench into the sidewalk |
DCS _EN _UU
Logistics Vignette Trench West | Delivery Manhole
Termination of open trench, begin utility boring |
|
|
|
|
DCS _EN _UU
4d Worksite Detail Trench West | Terminal Strip
Termination of open trench, begin utility boring |
CSV _LL _UU
Logistics Vignette Terminal Bore Site
Street-based location for final bore across thoroughfare |
CSV _TC _LL
Logistics Vignette Trench West Curb Cut Traffic Channelization
One of several closeups of curb cut trenching |
CSV _LL _TC
Logistics Vignette Trench East Parking Lot Entry Crossing
One of many closeups of drive crossings that do not cshut down traffic |
|
|
|
|
CSV _LL _TC
Logistics Vignette Trench West | Roadway Manhole at Academic Drive
Detail of roadway manhole installation at curb cut |
SVS _EN _UU
Vinci SubVision Solid™ Underground Intersection Crossing
Final bore under thoroughfare |
CSV _EN _LL
Logistics Vignette Rooftop and Areaway Hoisting
A view showing crane location for rooftop mechanical placement |
CSV _EN _LL
Logistics Vignette Rooftop and Areaway Hoisting
A view showing crane location for rooftop mechanical placement |
|
|
|
|
CSV _TC _LL
Logistics Vignette Rooftop and Areaway Hoisting Schedule
Accommodating just-in-time delivery of mechanical components |
CSV _TC _LL
Logistics Vignette Rooftop and Areaway Hoisting Detail
Closeup of crane location |
VVV _SG _TC
Vinci | Behind the Scenes Signage & Traffic Channelization
Custom and common traffic channelization and site safety signs |
|