4d virtual construction visualization early phase supply access

Vinci LLC | Construction Vignette | Early Phase Supply Access.

Don’t overuse 4d. The attractiveness of pushing moving pictures or still sequences sometimes lures us into overbuilding a graphic presentation. The audience can better focus on a single persistent still image to get your point sometimes. Let it sink in. This image shows an existing receiving dock at left and its proposed replacement at right. The temporary work zone set up around the replacement is shaped to facilitate truck access to the active dock. That’s all we want to say on this topic and we want it to stick in the minds of the audience: we’ll get you into a new dock before we close the old one and we have a way to do that safely and efficiently; this is proof.

Take a look at some topics: traffic channelization, phasing, site perimeter.