LOCATION:
Mid Atlantic

YEAR PRODUCED:
2014 Q3

VINCI CLIENT: SKA

CONST. VALUE:
2 ••

CONST. SCOPE:
4 •••

VINCI PROJECT LEVEL:
3 •••

DEVELOPMENT TIME (DAYS):
12 •·····

SURGE INTENSITY (%):
85%

VINCI FEATURES
Vinci Digital Worksite™
Vinci SketchBuild™
Channelization
Phasing
Vinci ClearSite™

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

a8948
A8948 CAMPUS
ENERGY PLANT

a8818
A8818 CAMPUS
RESEARCH

a9431
A9431 RESEARCH, SCHEMATIC

Dock Detour and Utility Umbilical

Plantwide work involving enabling work delivered early and construction of a research expansion and central energy plant.

a9440-00 a9440-13 a9440-16

GCS™ | General 4d
Worksite Overview


4d summary of all
worksite activities.

DCS™ | 4d Construction
Worksite Detail


Enabling work opens early, showing traffic channelization.

DCS™ | 4d Construction
Worksite Detail


Central Energy Plant construction.

a9440-20 a9440-26 a9440-48

Vignette™| Overhead Utilities

Routing and connection of overhead utilities to new and existing facilities.

Vignette™| Overhead Utilities

Utilities indicated schematically, interacting with master-planned roads.

Vignette™ | Traffic Channelization

Redirecting delivery traffic during and after enabling work.

a9440-70 a9440-92 a9440-94

Vignette™| Ground Level View

Worksite as seen from delivery road.

Vinci · Behind the Scenes
ClearSite™ Service

Setting the stage for your construction message!

Vinci · Behind the Scenes
SketchBuild™ Service

Turning boxes on the schematic plan into plausible facilities, so your team can talk construction.

This page last modified Thursday 17 December 2015.