LOCATION:
Mid Atlantic

YEAR PRODUCED:
2014 Q3

VINCI CLIENT: SKA
WIN

CONST. VALUE:
3 •••

CONST. SCOPE:
2 ••

VINCI PROJECT LEVEL:
••·

DEVELOPMENT TIME (DAYS):
9 •··

SURGE INTENSITY (%):
80%

VINCI FEATURES
Vinci Digital Worksite™
Branding
Channelization
Field Office
Phasing
Vinci SubVision™

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

a8948
A8948 CAMPUS
ENERGY PLANT

a8818
A8818 CAMPUS
RESEARCH

g9591
A9431 RESEARCH, SCHEMATIC

Inchoative Engineering in Progress

A new engineering school rises nestled between existing university facilities.

g9591-00 g9591-09 g9591-20

LogistiGraf™ | Simple General 4d Construction Worksite Overview

4d summary of
building construction activities.

LogistiGraf™ | Revised Early Phases (Perspectival)

Annotated first phases of worksite setup.

LogistiGraf™ | Revised Early Phases (Plan View)

Annotated first phases of worksite setup.

g9591-10 g9591-30 g9591-40

LogistiGraf™| Enabling Work

Routing and connection of overhead utilities to new and existing facilities.

LogistiGraf™| Early Phase Worksite Enlarged Plan

Closer and clearer view of a portion of the worksite.

LogistiGraf™ | Early Worksite Gate

Detail of pre-existing and reused access road.

g9591-16 g9591-50 g9591-80

SubVision™| Enabling Work Detail

Methodic detail of site utility transferral.

LogistiGraf™
Maintain Egress

Detail around field office and existing loading dock area.

CentNav™ Presentation
InDesign PDF

Simple interactive PDF user interface.

This page last modified Thursday 17 December 2015.