Vinci A9569Ivy Engineering School Gut Rehab |
This view shows the temporary fence and gate and how these interact with the operational loading and engineering shop drive paths.
Take a look at overall logistics in this area, at the roadside staging area, or an early study of this view. This page shows the 4d schedule from this viewpoint.
This page last modified Thursday 25 June 2015.