Vinci A9569Ivy Engineering School Gut Rehab |
This view shows the fence, gates, signage, and branding at an existing pedestrian crossing. The drive to the right must admit supply traffic for the neighboring facility, as well as pedestrians accessing the still-operational portion of the building under renovation. See a 4d schedule view from this side, the installation of the overhang at right, the protective canopy at far right, and a preliminary study of this area.
This page last modified Thursday 25 June 2015.