Vinci A85B5College Campus Master Plan |
LOCATION:
MIDWEST USA
YEAR PRODUCED:
2010 Q4
CONST. VALUE: ⇒
2 ••
CONST. SCOPE: ⇒
4 ••••
VINCI PROJECT LEVEL: ⇒
5 •••••
DEVELOPMENT TIME (DAYS): ⇒
84 •••• •••• ••••
SURGE INTENSITY (%): ⇒
0% —
VINCI FEATURES
Vinci VinEstate™
Vinci VinTerra™
Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.
A84A0 EDUCATION, VINESTATE
A8235 EDUCATION
A small college set upon scenic limestone bluffs is examining options for expansion. This project involved a VinTerra™ model of terrain using surveyors’ contour data. The general definition of all major and many minor improvements on site was also part of the work. The major improvements were built according to as-built drawings and Vinci’s site observations. Custom minor improvements were built according to observations and measurement on site. Presented below are two examples related to Vinci Project Number M85B5.
This page last modified Saturday 6 April 2013.