|
|||||||||||||||||||||||||||||||
R7B54 | Vinci™ Vignette | Site Orientation | Existing ConditionsThis is an overall view of a worksite well in excess of 100 acres as it exists today. This site is a Vinci™ Immersive Contextual Model (ICM™) where all structures and terrain are modeled. Click the links above the picture the following: |