Vinci LLC
ORIENTATION VIGNETTE.A VIGNETTE.B VIGNETTE.C VIGNETTE.D VIGNETTE.E
O1 A1 B1 C1 D1 E1
O2 A2 B2 C2 D2 E2
A3 C3 D3 E3
D4 E4

R7B54 | Vinci™ Vignette | Hoisting Studies | Application: Clear Site

Because a Vinci™ Immersive Contextual Model™ (ICM™) is available, any set of vignettes can be made to represent any segment of the worksite at any milestone in the construction schedule we have covered. All vignettes produced by an immersive model can represent 4d or time-related change. This is the state of this portion of the worksite after the existing facility has been demolished. « Previous Vignette | « Previous in Sequence | Next in Sequence » | Orientation Images »