4d virtual construction visualization schedule overview.

4d Construction Worksite Detail | Building 6 North Side.

Vinci LLC’s 4d Detail Construction Sequences™ take in project activity across a significant portion of the worksite and schedule. This detail takes in a standalone apartment block. A steep retaining wall masks much of the ground level on this side of the building. Atop the garage precast frame, limited structural steel and typical light gage framing supports the upper residential stories. The larger serpentine apartment block is under construction to the extreme left. Take a look behind the scenes at bank retention, excavation, and temporary access validation.

This page last modified Thursday 31 July 2014.