4d virtual construction visualization schedule overview.

4d Construction Worksite Detail | Building 6 South Side.

Vinci LLC’s 4d Detail Construction Sequences™ take in project activity across a significant portion of the worksite and schedule. This detail takes in a standalone apartment block. The ground level contains parking, with a precast structure. Atop this, limited structural steel and typical light gage framing supports the upper residential stories. The larger serpentine apartment block is under construction to the extreme left. Take a look behind the scenes at bank retention, excavation, and temporary access validation, as well as the subject of modeling complex architecture.

This page last modified Thursday 31 July 2014.