LOCATION:
Northeast

YEAR PRODUCED:
2013 Q3

VINCI CLIENT: WMI
SHOW

CONST. VALUE:
1

CONST. SCOPE:
2 ••

VINCI PROJECT LEVEL:
•••••••·

DEVELOPMENT TIME (DAYS):
46 ♦••·

SURGE INTENSITY (%):
52%

VINCI FEATURES
Vinci Digital Worksite™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a9224
A9224 EDUCATION
STUDENT HOUSING

a9168
A9168 EDUCATION
LOCATION

a80b0
A80B0 EDUCATION
LOCATION, SIGNATURE
ARCHITECTURE

Scholastic Serpentine Studios.

A delightful place to live in a major college town, on undulating hills in view of waterfalls and minutes from campus. Like the hills they stand on, two curvacious apartment blocks wind through the trees, with a quiltlike exterior on the south side, and dragonlike scales on the north. The buildings have four structural systems, cast-in-place, precast, light gage, and structural steel. The project illustrates the construction schedule as well as excavations and temporary access roads. These remain one of the most challenging buildings Vinci LLC has ever modeled!

Click the images on the following menu to view the examples:

a90b1-00 a90b1-01 a90b1-50

General 4d Construction Worksite Overview | Interval

Major worksite activity beginning ¼ through the construction schedule.

General 4d Construction Worksite Overview | Continuous

Major worksite activity beginning ¼ through the construction schedule.

4d Worksite Detail
Building 5 | Southwest Sequence.


Serpentine apartment block with three segments

a90b1-52 a90b1-53 a90b1-61

4d Worksite Detail
Building 5.2 Sequence.


Middle segment of the longer apartment block

4d Worksite Detail
Building 5.3 Sequence.


End segment of the apartment block, with parking beneath

4d Worksite Detail
Building 6 | Northeast Sequence.


Single segment standalone apartment block

a90b1-90 a90b1-91 a90b1-92

Vinci · Behind the Scenes
Bank Retention Validation.


The bank retention shop drawings versus anticipated terrain elevations help fine tune a steep cut

Vinci · Behind the Scenes
Temporary Access.


Client review images that aim to justify 1:2 layback and guarantee a temporary access between building sites

Vinci · Behind the Scenes
Building 5.3 Excavation vs Temporary Access.


Layback and excavation into stone requires some study to guarantee access between building sites

This page last modified Thursday 31 July 2014.