LOCATION: US NORTHEAST

YEAR PRODUCED:
2008 Q4

WIN

CONST. VALUE:
3 •••

CONST. SCOPE:
3 •••

VINCI PROJECT LEVEL:
4 ••••

DEVELOPMENT TIME (DAYS):
9 •··

SURGE INTENSITY (%):
96% •••

VINCI FEATURES
Vinci Digital Worksite™
Vinci SubVision Xray™
Vinci VinTerra™
Vinci CentNav™

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

a80b6
A80B6 EDUCATION, LOCATION

David vs. Goliath

Guess who won? A signature architect designed a new school of architecture on an “Ivy League” university campus. The concept is simple in theory but stretches steel framing to its limit. Vinci helps illustrate how its client will slay the beast. Click on the images below to view examples from Vinci Project Number A80B0.

a80b0-00 a80b0-10 a80b0-11

GCS™ | General 4d Construction Worksite Overview

The general worksite overview

DCS™ | 4d Worksite Detail | Main Structure

Worksite detail covering construction of the proposed main structure

DCS™ | 4d Worksite Detail | Structure Meets Public Realm

Worksite detail illustrating a portion of the structure near a pedestrian path

a80b0-12 a80b0-13 a80b0-20

DCS™ | 4d Worksite Detail | Enabling Work

A 4d illustration of enabling work

DCS™ | 4d Worksite Detail | Sitework

A 4d view of sitework

Vignette™ | Constructability | Specialty Formwork Study

Illustration of a specialty formwork concept

a80b0-21 a80b0-01 a80b0-99

Vignette™ | General 4d Construction Worksite Overview

A study of the scale of proposed structural elements

SubVision Xray™ | Existing Underground Utilities

4d plan view of the worksite showing the existing site utility system.

Video Summary

Dramatic September 2019 video produced ahead of a visit to Milstein Hall, Cornell University.

Check out news regarding the actual construction of this project here.

This page last modified Saturday 14 September 2019.