LOCATION:
NORTHEAST USA

YEAR PRODUCED:
2008 Q4

CONST. VALUE:
2 ••

CONST. SCOPE:
2 ••

VINCI PROJECT LEVEL:
6 ••••••

DEVELOPMENT TIME (DAYS):
24 •••···

SURGE INTENSITY (%):
36% ••

VINCI FEATURES
Vinci Digital Worksite™
Vinci SubVision Solid™
Vinci Vignette™
Vinci VinTerra™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a7a04
A7A04 EDUCATION, LOCATION, SUBVISION

a80a4
A80A4 EDUCATION

a80b0
A80B0 EDUCATION,
LOCATION

a8235
A8235 EDUCATION

Serene Simplicity

A 4d construction worksite simulation illustrating general conditions and micro phasing of concrete work. Underground utilities, enabling work, temporary staging and logistics, and community and user group vignettes make for a powerful set of construction visualizations.

a80b6-00 a80b6-20 a80b6-24

GCS™ | Project Context

Signature architecture in a park-like setting (Begin your tour here.)

GCS™ | General 4d Construction Worksite Overview

4d summary of major worksite activities

DCS™ | 4d Construction Worksite Detail: Concrete Phasing

Concrete micro-phasing

a80b6-01 a80b6-24 a80b6-10

GCS™ | Field Offices

Construction Yard and Field Office

DCS™ | Subsurface Constraints

4d Section through existing sawtooth portion of existing building

GCS™ | 4d Trench Utility Installation

4d summary of major worksite activities

a80b6-v2 a80b6-v1 a80b6-v0

Vignette™ | Faculty View of the Staging Yard

4d Simulation of the staging yard from a neighboring academic building

Vignette™ | The Museum Entrance

Simulation at the Museum Entrance

Vignette™ | Classroom view of the worksite

Simulating how the worksite appears from a neighboring classroom