LOCATION:
West

YEAR PRODUCED:
2016 Q2

VINCI CLIENT: MWH

CONST. VALUE:
3 •••

CONST. SCOPE:
5 •••••

VINCI PROJECT LEVEL:
4 ••••

DEVELOPMENT TIME (DAYS):
14 ••

SURGE INTENSITY (%):
4%

VINCI FEATURES
Vinci Digital Worksite™
Vinci VinTerra™ 1 →
Vinci SubVision™ 1 → 2 →
Vinci SketchBuild™ 1 →

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

aa069
AA069 WET INFRASTRUCTURE
NEW PLANT

a9a09
A9A09 WET INFRASTRUCTURE
PLANT EXPANSION

a9663
A9663 WET INFRASTRUCTURE
PLANT EXPANSION

Wilderness Water Works

Design-build study of a greenfield water treatment facility.

a9906-00 a9906-06 a9906-10

DWS™ | Construction 4d
Schedule Overview


4d Construction Phasing and Logistics Sequence.

DWS™ | 4d Construction
Worksite Detail


Brief 4d Construction Phasing and Logistics Sequence.

DWS™ | 4d Construction
Worksite Detail


Plant Layout above and below Ground.

a9906-50 a9906-70 a9906-80

DWS™ | Vinci Digital Worksite™

Plant Approach Simulation.

Vinci SubVision™
Yard Piping

Process Facility Constrution.

Construction Vignette™

Design-Build Wet Infrastructure Renderings.