LOCATION:
West

YEAR PRODUCED:
2018 Q1

VINCI CLIENT: MWH
WIN

CONST. VALUE:
3 •••

CONST. SCOPE:
4 ••••

VINCI PROJECT LEVEL:
5 ••••

DEVELOPMENT TIME (DAYS):
15 ••·

SURGE INTENSITY (%):
0%

VINCI FEATURES
Vinci Digital Worksite™
Vinci SubVision™ 1 → 2 →
Vinci Validation 1 →
Vinci SketchBuild™ 1 →

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a9a09
A9A09 WET INFRASTRUCTURE
PLANT EXPANSION

a9906
A9906 WET INFRASTRUCTURE
DESIGN-BUILD PLANT

a9663
A9663 WET INFRASTRUCTURE
PLANT EXPANSION

Click the images to view examples

4d construction logistics plan View a 4d plantwide construction logistics simuLation

clarifier build out Design development drawings to realistic build simulation!

yard piping simulation See what’s under the hood! Yard piping included!

tower crane coverage diagram Tower crane coverage diagram proves your build strategy.

4d virtual construction phase detail Check out field offices.

wet infrastructure facility renderings Vinci’s views aim to match your document set and normally are the best project specific renderings the Owner has seen.

Water Plant Power Play.

Click here→ to see examples of work. Use the menus above to visit other examples!

Water Works Wax out West

The community’s water needs are in a growth phase and a big roll out of the latest water treatment engineering has landed on your desk. The soil is marshy and part of the story is a general site fill. A dozen new structures will be constructed in this first phase. The RFP contains fairly solid drawings, enough to speak to finishes and yard piping. It’s down to you. How are you going to distinguish your team’s proposal from the others? Can your team convey a solid strategy to the Owner’s review team clearly and convincingly?

Build It Right, Build it Tight

A plantwide expansion requires reviewing activity throughout the yard. Concrete pours and phasing are the main drivers and hoisting is also key. Settling these and constant site fill are the main stories. Vinci LLC helped coordinate the modeling of the planned facility, showing the Owner that your team completely understands the RFP. Additionally, your company’s experts have wrestled with key aspects of the work even before the job comes over the transom.

Clear and convincing, audience-friendly construction imagery

You don’t want to be at the business end of a powerfully-illustrated proposal and interview your competitor has wielded in the meeting before or after your team! Vinci LLC specializes in the “advancement” or “completion” of design drawings so you can talk construction. Further, Vinci LLC’s analysis of proposed conditions can be a great tool in your team’s arsenal. Finally, Vinci LLC is the king of complicated phase visualizations, helping teams communicate their solutions to Owners and helping win bids, or helping explain planned work to user groups. The result of the work is a set of clear and convincing renditions of the worksite that serve as aids to discussion of all major construction issues throughout the construction schedule. Vinci’s clear, convincing, and audience-friendly construction marketing logistics plans are ideal for communicating a real estate or construction message, whether you are selling construction services or just thinking big. Be the master of your plan, call Vinci LLC today!
314-351-7456.

This page last modified Thursday 14 March 2019.