Vinci A8235 Example Navigator
Welcome to the example navigator! This menu accesses all one dozen eleven examples deriving from Vinci Project Number A8235. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example.
|
|
|
|
GCS
East 4d Sequence
View the project from the east |
DCS
Enclosure
Enclosure from the east |
DCS
Enclosure
Enclosure from the west |
DCS SVS VTA DWS
South Connection to Maintenance Building
Deep tunnel connection south |
|
|
|
|
DCS SVS VTA DWS
East Tunnel Tie In
Underground tie-in under front entrance |
CSV DWS
Site Logistics
Worksite viewed from the west |
CSV DWS
View from Academic Hall
Look onto the worksite from the north |
CSV DWS
View from Maintenance Building
Peek at the worksite from the south |
|
|
|
|
CSV MSV
Pedestrian Experience during Construction
Walk alongside the worksite |
CSV DWS VTA BAV
Service Drive during & after Construction
See a deep cut into the existing slope |
CSV DWS VTA BAV
Pedestrian Crossing during & after Construction
View looking across a main drive to the worksite |
SVS
Underground Site Utility System
SubVision™ view of site utilities |
|
|
|
|
SVS
Underground Site Utility System
Alternate view of underground utilities |
SVS _SV
Strategy Validation
SubVision™ as a tool to inform early strategy |
DWS SVS
East-West (Transverse) Section
Cutaway view across the width of the building |
DWS SVS _UU
East Tunnel Intercept
Cutaway view showing a link to the east tunnel |
|
|
|
|
DWS SVS
North-South (Longitudinal) Section
Cutaway view across the length of the building |
DWS SVS _UU _SV
North Section vs. Utility Tunnel
Close approach to an existing underground tunnel |
DWS SVS _UU
South Section
Clearance and vertical relationship to the Maintenance Building |
DWS SVS _UU
South Tunnel Intercept
Cutaway view showing a link to the Maintenance Building |
|
|
|
|
DWS SVS VTA
Deep Cut along Planned Service Drive
Illustration of the depth of a cut at the service drive |
DWS SVS
Temporary Drive vs. Underground Utilities
Cutaway view showing how logistics relate to underground utilities |
CCV _CI
Contextual Major Improvements
Behind the scenes look at contextual major improvements |
|
This page last modified Thursday 26 May 2011.