Water Treatment Plant Plantwide Study

Vinci Construction Vignette™ | Plantwide Study.

This is a survey of proposed facilities in place upon proposed terrain and sitework. This is a “check” to ensure that all the pieces are in place ahead of application of schedule to make for a 4d construction logistics plan. In these images, all major proposed facilities have structure, enclosure, and process mechanical in place. Some Vinci Digital Worksite™ models also include yard piping.

Click for more: plantwide schedule; excavation plan view, worksite model demolition, facility highlight, cutaway. Go behind the scenes to see terrain or context modeling, preliminary facility scheduling. Check out demolitions on other projects.

This page last modified Sunday 11 February 2018.