Vinci A9460University Medical Center Headquarters |
This 4d cross section of the worksite shows the extraction of an existing partially demolished foundation, site utilities, and the encapsulation of hot soil. The section speaks volumes about how the builder intends to mitigate poor conditions on site and get out of the ground as fast as possible.
Check out another section looking perpendicular to this one. Take a look at this side of the site from the air. Go behind the scenes to see what went into the production of this scene.
This page last modified Monday 23 November 2015.