Vinci A9640 Example Navigator

Welcome to the example navigator! This menu accesses all one dozen ten examples deriving from Vinci Project Number A9640. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example.

a9640-00 a9640-10 a9640-12 a9640-14

DWS GCS _SD
4d Construction Schedule Sequence.
Overview of construction logistics across the entire schedule.

DCS _SX _TS
4d Construction Worksite Detail
Tight Site Excavation.

4d excavation simulation.

DCS _SX _TS
4d Construction Worksite Detail
Tight Site Excavation.

4d excavation simulation, alternate viewpoint.

DCS _KK _PH
4d Construction Worksite Detail
Steel Frame Phasing.

4d illustration of steel frame segmentation.

a9640-18 a9640-20 a9640-23 a9640-26

DCS _KK _PH
4d Virtual Worksite Detail
Finish Ground Level.

4d view of work under the tower after dry in.

DCS _EE _LL
Construction Workflow Vignette
Exterior SW.

First segment of scaffold.

DCS _EE _LL
Construction Workflow Vignette
Exterior SE.

Continuation of exterior scaffold.

DCS _EE _LL
Construction Workflow Vignette
Exterior NE.

Third segment of scaffold.

a9640-29 a9640-30 a9640-36  

DCS _EE _LL
Construction Workflow Vignette
Exterior NE.

Last part of scaffold sequence.

DCS _RE _PH
4d Construction Worksite Detail
Drive Thru Renovation.

Renovation of a drive-thru underneath a neighboring building.

DCS _RE _PH
4d Construction Worksite Detail
Drive Thru Renovation.

Alternate view of the drive-thru renovation.

 
a9640-40 a9640-43 a9640-46 a9640-49

CSV _TC _LG
Construction Strategy Vignette
Lane Closure (East).

Study of traffic closure for construction service to tower.

CSV _TC _LG
Construction Strategy Vignette
Lane Closure (West).

Exit site of traffic closure for construction service to tower.

CSV _TC _LG
4d Construction Worksite Detail
Buck Hoist and Construction Waste.

Descriptive view of site supply and hauling.

CSV _TC _LG
Construction Strategy Vignette
Buck Hoist and Construction Waste.

Detail of hauling, hoisting and exit from worksite.

a9640-50 a9640-53 a9640-56 a9640-59

VVV _SD _AA
Construction Workflow Vignette
Exterior SW (Scaffold Hidden).

Start corner for enclosure construction, shown without scaffold.

VVV _SD _AA
Construction Workflow Vignette
Exterior SE (Scaffold Hidden).

Second corner of enclosure construction.

VVV _SD _AA
Construction Workflow Vignette
Exterior NE (Scaffold Hidden).

Third corner of enclosure construction.

VVV _SD _AA
Construction Workflow Vignette
Exterior NW (Scaffold Hidden).

Conclusion of enclosure.

a9640-70 a9640-90 a9640-96  

CSV LOG _TT
Construction Strategy Vignette
Plan Overview.

Basic plan overview of construction strategy.

CSV LOG _TT
Construction Strategy Vignette
Buck Hoist and Waste Collection Study.

Second draft of hauling/buck hoist/emergency stair.

CSV LOG _TT
Construction Strategy Vignette
Buck Hoist and Waste Collection Study.

First draft of hauling/buck hoist/emergency stair.

 
This page last modified Tuesday 5 January 2016.