Vinci Digital Worksite™

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

a9460
A9460 HIGH RISE
TIGHT SITE

a8987
A8987 HIGH RISE
TIGHT SITE

a8948
A8948 HIGH RISE

Hugging a Highrise Hit

On a tight downtown worksite, steel phasing, scaffold & enclosure, lane closure site supply and hauling, and a drive-thru renovation star in this hit.

a9640-00 a9640-10 a9640-14

GCS™ | Construction 4d
Schedule Overview


4d summary of all
worksite activities.
See a plan view.

DCS™ | 4d Construction
Worksite Detail


Tight Site Excavation.
See alternate view.

DCS™ | 4d Construction
Worksite Detail


Steel Frame Phasing.

a9640-18 a9640-20 a9640-50

DCS™ | 4d Construction
Worksite Detail


Ground Level Completion.

Workflow Vignette™
Exterior Scaffolding

Travel round the tower to see scaffolding workflow. Segments 2→, 3→, 4→.

Workflow Vignette™ | Exterior

See exterior schedule without the scaffold in the way. Segments 2→, 3→, 4→.

a9640-30 a9640-40 a9640-46

DCS™ | 4d Construction
Worksite Detail


Drive Thru Renovation.

Vignette™
Lane Closure

View site access inbound or outbound. Segments 2→, 3→, 4→.

Vignette™ | Buck Hoist and Construction Waste

See detail.