Water Treatment Plant Construction Logistics Plan

Vinci General Construction Sequence™ | Alternate 4d Plantwide Construction Logistics Plan.

Ever look at something the same way each day, then come at it from a different direction and gain insight? This is what multiple viewsets achieve. Each visual perspective conveys a different mental point of view. The main 4d overview shows the plant from the opposite direction, accentuating the cylindrical clarifiers. This view accentuates the headworks. The summary view puts the field offices and administrative building up front. Another view shows the site from opposite that summary view and accentuates the long bioreactor structures and temporary staging area. We might also get a better fix on hoisting. Motion is not engaged as a consistent vantage point is clearer to most people; motion induces confusion in some, but has its uses.

Click here for links to other examples: see the plan from other views: 1→, 2→, 3→. Take a look at 4d facility construction details: 1→, 2→, 3→, 4→. Take a peek underground or see crane coverage.

This page last modified Wednesday 7 February 2018.