LOCATION: US NORTHEAST

YEAR PRODUCED:
2008 Q4

WIN

CONST. VALUE:
3 ••••

CONST. SCOPE:
3 •••

VINCI PROJECT LEVEL:
4 ••••

DEVELOPMENT TIME (DAYS):
10 •···

SURGE INTENSITY (%):
82% ••·

VINCI FEATURES
Vinci Digital Worksite™
Vinci VinTerra™

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

a8818
A8818-A8869 REDUX

a80b6
A80B6 EDUCATION, LOCATION

a80b0
A80B0 EDUCATION, LOCATION

Pi in the Sky

Click here→ to see examples of work. Use the menus above to visit other examples.

The University is considering a brilliant new research tower — it’s only in schematic form now, but it’s sure to revolutionize computer science. A research reactor needs to be cleared away, and as on any campus, attention to pedestrian circulation is key. Because the proposed schematic structure nestles amid active academic buildings, egress, ventilation, and vehicular access to delivery points must be minded. The steep topography adjacent to the schematic building must be kept free of worksite runoff. Vinci’s construction visualization illustrates all these points to help its client clinch the job.

Project Moratorium, Hibernation, and Redux

Later in 2008, the university held a moratorium on most construction projects, including this one. The project went into “hibernation”. When it emerged in the late spring of 2011, Vinci’s client had to interview once again for the project. It was as if they’d never had won. The project visualization was re-developed as a more firm design was produced for a nearby site. (The redux project, A8818-A8869, is featured on this website here). Vinci’s client won the project once again in late summer 2011!

Click the images below to see examples from Vinci Project Number A80A4:

a80a4-00 a80a4-01 a80a4-22

GCS™ | General 4d Construction Worksite Overview

The general worksite overview

GCS™ | Worksite Overview | Schematic Future Phase

Covering all bases, including future phases

GCS™ | Worksite Overview | Demolition Phase

Overview vantage point showing research reactor demolition

a80a4-20 a80a4-21

DCS™ | 4d Worksite Detail | Reactor Demolition

Closer view of the reactor demolition micro-phasing

DCS™ | 4d Worksite Detail | Reactor Demolition

View of the reactor demolition micro-phasing from a different angle