LOCATION:
WESTERN CENTRAL USA

YEAR PRODUCED:
2010 Q3

CONST. VALUE:
1

CONST. SCOPE:
2 ••

VINCI PROJECT LEVEL:
1

DEVELOPMENT TIME (DAYS):
4 ····

SURGE INTENSITY (%):
0%

VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™
Vinci DCS™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8306
A8306 HEALTHCARE
CAMPUSWIDE WORK

a8373
A8583 HEALTHCARE
CAMPUSWIDE WORK

Kit of Parts

This project page presents the parking garage as if it were a project unto itself. In actuality, it was one component of a campuswide healthcare construction project. Such a project would have weighed in at level one, produced in less than four work days. Presented below are some examples related to the precast parking structure, part of Vinci Project Number A8583. (Use the Example Navigator to view all A8583 examples, or view the campus project page.)

a8583-30 a8583-31 a8583-32

GCS™ | General 4d Construction Worksite Overview

Parking deck worksite overview.

GCS™ | General 4d Construction Worksite Overview
Alternate Logistics


Parking deck worksite with an alternate logistics layout.

Vignette | Logistics & Community Relations

A view of the parking deck under construction, complete with the site fence.

a8583-39 a8583-36 a8583-38

Behind the Scenes
4d Model from Schematics

Images of precast component systems used to confirm the model qualifies to convey construction strategy.

Behind the Scenes
Preliminary Logistics Study

Images of logistics at the worksite entry used to confirm project directives have been met.

Behind the Scenes
Preliminary Phasing Study

Preliminary images furnished so the joint-venture client could consider phasing options.

a8583-37

Behind the Scenes
Lengthwise (Longitudinal) Section

Preliminary section images used to verify the model.

This page last modified Monday 10 October 2011.