LOCATION:
WESTERN CENTRAL USA

YEAR PRODUCED:
2010 Q3

CONST. VALUE:
4 ••••

CONST. SCOPE:
4 ••••

VINCI PROJECT LEVEL:
7 •••••••

DEVELOPMENT TIME (DAYS):
25 •••····

SURGE INTENSITY (%):
19% •·

VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™
Vinci DCS™
Vinci SubVision Xray™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8306
A8306 HEALTHCARE
CAMPUSWIDE WORK

a8373
A8373 HEALTHCARE
CAMPUSWIDE WORK

Ring around the Active Medical Center

This five-component campuswide project nearly encircles an active university medical center. There are two parking structures: a 6 level precast parking deck, and a three level underground concrete parking deck. A high-rise steel-frame patient tower is slated to connect to one end of an existing tower. Surgery functions will occupy the bottom floors of the tower. The front entry of the hospital site will be overhauled. The logistics of this project were originally configured to occupy a site near the precast deck. Late in the development of this interview effort, the Owner threw in a cancer center addition, a fifth component of the work. This necessitated a revision of the overall logistics, placing the field office near the cancer center. Several vignettes study the impact of the work on user groups and the community, at the precast and underground parking structures, associated with sitework, and at the cancer center. Several logistics vignettes (1 →, 2 →, 3 →) were developed as well. Presented below are some examples related to Vinci Project Number A8583. (Use the Example Navigator to view all A8583 examples.)

a8583-00 a8583-10 a8583-20

GCS™ | General 4d Construction Worksite Overview

Campuswide worksite overview.

DCS™ | 4d Worksite Detail
Patient Tower


A steel-frame surgery and patient care addition.

DCS™ | 4d Worksite Detail
Cancer Center Addition


A late-breaking cancer center addition pops into the project. View this component as an independent project.

a8583-30 a8583-40 a8583-50

DCS™ | 4d Worksite Detail
Precast Parking Deck


Take a look at a nearly self contained parking deck project, produced from schematics. View this component as an independent project.

DCS™ | 4d Worksite Detail
Underground Parking


View construction of a two-level underground parking deck. View this component as an independent project.

DCS™ | 4d Worksite Detail
Sitework Phasing


Ever do a 15-square puzzle? This one only has a few squares. One of them is at the Hospital’s front door.

a8583-60 a8583-70 a8583-80

DCS™ | 4d Worksite Detail
Field Office & Staging Area


A nice little place to put all your folks, boxes, and toys.

SubVision Xray™ | Enabling Work

Show the Owner how your team will relocate utilities in a blow-by-blow manner using Vinci SubVision Xray™

Vignette | Temporary Pedestrian Circulation

What’s it like for the staff, visitors, and patients during construction? Show ’ using Vinci Stakeholder Vignettes™.

This page last modified Wednesday 16 November 2011.