LOCATION:
WESTERN CENTRAL USA

YEAR PRODUCED:
2010 Q3

CONST. VALUE:
2 ••

CONST. SCOPE:
2 ••

VINCI PROJECT LEVEL:
2 ••

DEVELOPMENT TIME (DAYS):
5 ·····

SURGE INTENSITY (%):
0%

VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™
Vinci User Group Vignette™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8306
A8306 HEALTHCARE
CAMPUSWIDE WORK

a8373
A8583 HEALTHCARE
CAMPUSWIDE WORK

Schematic Extension

This project page presents the cancer center addition as if it were a project unto itself. In actuality, it was one component of a campuswide healthcare construction project. Such a project would have weighed in at level two, produced in around five work days. Presented below are some examples related to the precast parking structure, part of Vinci Project Number A8583. (Use the Example Navigator to view all A8583 examples, or view the campus project page.)

a8583-20 a8583-21 a8583-22

GCS™ | General 4d Construction Worksite Overview

A general view of construction of the cancer center addition.

DCS™ | 4d Construction Worksite Detail

A 4d view of work from the north.

User Group Vignette | Logistics & Community Relations

A 4d view of the existing and temporary covered walkway.

a8583-26 a8583-28 a8583-29

User Group Vignette
Temporary Covered Walkway

Study of a temporary covered walkway.

Vinci · Behind the Scenes
Concrete Frame Mockup

Review images of the concrete frame implied by schematics.

Vinci · Behind the Scenes
Cancer Center Addition

Vinci SurePlan™ helps rapidly define a cancer center addition.