Vinci A8373Hospital Infill Expansion |
LOCATION:
MIDWEST USA
YEAR PRODUCED:
2009 Q4
CONST. VALUE: ⇒
4 ••••
CONST. SCOPE: ⇒
4 ••••
VINCI PROJECT LEVEL: ⇒
6 ••••••
DEVELOPMENT TIME (DAYS): ⇒
40 •••••·····
SURGE INTENSITY (%): ⇒
35% ••·
VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™
Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.
A8583 HEALTHCARE
CAMPUSWIDE WORK ⇒
A8306 HEALTHCARE
CAMPUSWIDE WORK ⇒
R79B8 HEALTHCARE
CAMPUSWIDE WORK
This project involves the surgical extraction of a landlocked hospital wing on a crowded downtown medical center campus. Interior circulation, demolition, excavation, traffic channelization, and wayfinding are studied. The construction site occurs very close to the core of the hospital and will present challenges to the established circulation pattern. Presented below are some examples related to Vinci Project Number A8373. (Use the Example Navigator to view all A8373 examples.)
This page last modified Wednesday 16 November 2011.