LOCATION:
MIDWEST USA

YEAR PRODUCED:
2009 Q4

CONST. VALUE:
4 ••••

CONST. SCOPE:
4 ••••

VINCI PROJECT LEVEL:
6 ••••••

DEVELOPMENT TIME (DAYS):
40 •••••·····

SURGE INTENSITY (%):
35% ••·

VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8583
A8583 HEALTHCARE
CAMPUSWIDE WORK

a8306
A8306 HEALTHCARE
CAMPUSWIDE WORK

r79b8
R79B8 HEALTHCARE
CAMPUSWIDE WORK

Getting in and around the War Zone

This project involves the surgical extraction of a landlocked hospital wing on a crowded downtown medical center campus. Interior circulation, demolition, excavation, traffic channelization, and wayfinding are studied. The construction site occurs very close to the core of the hospital and will present challenges to the established circulation pattern. Presented below are some examples related to Vinci Project Number A8373. (Use the Example Navigator to view all A8373 examples.)

a8373-00 a8373-10 a8373-12

GCS™ | General 4d Construction Worksite Overview

The general worksite overview

DCS™ | 4d Worksite Detail | Building Construction Workflow

Worksite detail portraying structural workflow

DCS™ | 4d Demolition Detail | Infill Site

Overview of a tricky partial demolition

a8373-20 a8373-22 a8373-30

DCS™ | 4d Demolition Detail | Building Separation

Building separation joint vs. demolition

DCS™ | 4d Demolition Detail | Infill Worksite

Cutting a building in half — carefully

DCS™ | 4d Excavation Detail | Construction Tactics

Excavation to connect new and old basements, under existing first floor

a8373-61 a8373-70 a8373-80

SurePlan™ | Interior Circulation Analysis

Analyzing the existing interior circulation

Vignette | Traffic Channelization

Driver’s-eye view of a partial closure

Vignette | Cross Section through Infill Site

Excavation dodges an existing utility tunnel