Vinci A8583 Example Navigator

Welcome to the example navigator! This menu accesses all two dozen eight examples deriving from Vinci Project Number a8583. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example.

a8583-00 a8583-01 a8583-10 a8583-11

GCS DWS _SD
4d General Worksite Overview
All major activities across an active medical center campus

GCS DWS _SD
4d Construction Worksite Overview
Alternate view of campuswide activity

DCS DWS _SD
4d Worksite Detail
Patient Tower

All west side activities, including enabling work

DCS DWS _SD
4d Worksite Detail
Patient Tower

Patient Tower from the west

a8583-12 a8583-13 a8583-20 a8583-21

DCS DWS _SD
4d Worksite Detail
Patient Tower

Patient Tower from the east

DCS DWS _SD
Tower Perimeter Interface
A view of the circulation cores and possible underpinning locations

DCS DWS _SD
4d Worksite Detail
Cancer Center Addition

View of the addition from the west

DCS DWS _SD
4d Worksite Detail
Cancer Center Addition

A view of the addition from the north

a8583-22 a8583-26 a8583-27 a8583-28

UGV CRV _LL
Stakeholder Vignette
Cancer Center Addition

Pedestrian view of covered entry

UGV _LL _TC
Stakeholder Vignette
Temporary Covered Walkway

Studies of a temporary covered walkway

CCV UGV _LL
Vinci · Behind the Scenes
Temporary Covered Walkway

Review images of a temporary covered walkway

CCV DWS _KK
Vinci · Behind the Scenes
Concrete Frame Mockup

Review images of a Vinci LLC concrete frame from schematics

a8583-29 a8583-30 a8583-31 a8583-32

CCV SPA _SD
Vinci · Behind the Scenes
Cancer Center Addition

Vinci SurePlan™ definition of a schematic project

DCS DWS _SD
4d Worksite Detail
Precast Garage

4d overview of precast parking construction

DCS DWS _SD
4d Worksite Detail
Precast Garage

4d view of construction with alternate logistics layout

UGV CRV _LL
Stakeholder Vignette
Precast Garage

Community view of street corner during construction

a8583-36 a8583-37 a8583-38 a8583-39

CCV DWS _VL
Vinci · Behind the Scenes
Precast Garage

Logistics Studies

CCV DWS _SD
Vinci · Behind the Scenes
Precast Garage

Longitudinal (Lengthwise) Sections

CCV DWS _VL
Vinci · Behind the Scenes
Precast Garage

Phasing Studies

CCV DWS _SD
Vinci · Behind the Scenes
Precast Garage

4d Precast Garage Model Definition

a8583-40 a8583-41 a8583-42 a8583-43

DCS DWS _SD
4d Worksite Detail
Underground Garage

Overall view of work from the south

UGV CRV _LL
4d Worksite Detail
Underground Garage

Close-up view of garage from the west

CSV _LL _SX
Underground Garage | Haul Ramp
Logistics · Excavation Haul Ramp

UGV CRV _TC
Stakeholder Vignette
Underground Garage

Assorted vignettes showing integration with the campus

a8583-49 a8583-50 a8583-51 a8583-60

CCV DWS _SD
Vinci · Behind the Scenes
Underground Garage

4d Underground Garage Model Definition

DCS DWS _SS
4d Worksite Detail
Sitework Phasing Overview

4d development of the vehicular entry to the hospital campus

DCS DWS _SS
4d Worksite Detail
Sitework Phasing Detail

4d development of vehicular circulation at the hospital main entrance

CSV _LL _VL
Field Office and Staging Area
Field office for all campus construction operations.

a8583-70 a8583-71 a8583-80 a8583-81

SVX _EN _UU
4d Enabling Work Overview
Overview of enabling work at precast garage and patient tower

SVX _EN _UU
Site Utility Enabling Work
4d site utility phasing illustration

UGV MSV _TC
Stakeholder Vignette
Staff, Patient, & Visitor
Experience during Construction

4d iew of temporary conditions vs. pedestrian circulation

CSV _TC _LL
Construction Vignette
Staff, Patient, & Visitor
Experience during Construction

4d view of user group route from parking to hospital

This page last modified Friday 1 August 2014.