LOCATION:
WESTERN CENTRAL USA

YEAR PRODUCED:
2010 Q3

CONST. VALUE:
1

CONST. SCOPE:
1

VINCI PROJECT LEVEL:
1

DEVELOPMENT TIME (DAYS):
3 ···

SURGE INTENSITY (%):
0%

VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™
Vinci DCS™
Vinci Vignettes™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8306
A8306 HEALTHCARE
CAMPUSWIDE WORK

a8373
A8583 HEALTHCARE
CAMPUSWIDE WORK

Dig This Parking Spot

This project page presents the underground parking garage as if it were a project unto itself. In actuality, it was one component of a campuswide healthcare construction project. Such a project would have weighed in at level one, produced in less than three work days. Presented below are some examples related to the precast parking structure, part of Vinci Project Number A8583. (Use the Example Navigator to view all A8583 examples, or view the campus project page.)

a8583-40 a8583-41 a8583-42

GCS™ | General 4d Construction Worksite Overview

General overview of the major construction activities for an underground parking deck.

DCS™ | 4d Worksite Detail

4d view focusing on the construction of an underground parking deck.

Vignette | Mass Excavation Haul Ramp

A view of the ramp to the pit bottom during construction.

a8583-43 a8583-49

Vignette | Assorted community views

Views of the worksite from adjacent streets and lots.

Behind the Scenes
Model Definition

Production-stage images of the parking garage, produced from schematic drawings.

This page last modified Monday 10 October 2011.